LEO, MEO, GEO: Operators Chart the Multi-Orbit Path Forward
- توسط icasat
- 10 January 2024
- News
Deep-water drilling is often a $10 million a day, mission-critical operation. If
a signal drops, and an oil rig engineer can’t track their machinery for more than a
few seconds, they have to shut down operations — or risk the safety of their crew.
Safety is a priority — but that’s a lot of money down the drain.
برچسبها: GEO, LEO, MEO, Multi-Orbit, Multi-Orbit Path Forward